“Put the data center in space” is an appealing way to remove a land-use argument from a data center proposal. It does not remove the engineering. It changes which utility bill dominates.
For a consistent comparison, keep the same load from the orbital model: 1.0 GW of IT equipment, 1.2 GW after a 20% facility overhead allowance, running all year. At 8,760 hours per year, total facility energy is 1.2 GW × 8,760 h = 10,512 GWh = 10.512 TWh/year. That is the load generation and storage must serve before adding desalination or transmission losses.
A gigawatt scale data center is an electricity supply project as much as a building project. The utility connection has to bring in roughly 1.2 GW continuously, transformers must handle that load, and the cooling plant must reject the resulting heat. A renewable contract that produces enough energy on paper still needs a plan for the hour when demand and generation do not match.
Solar alone can meet the annual total and still miss the night
Consider the earlier Earth side scenario: 8 GWdc of solar, a 1.34 DC to AC ratio, and a 27% AC capacity factor. The implied average output is (8 GWdc ÷ 1.34) × 0.27 = 1.612 GW. Over a year, that is 1.612 GW × 8,760 h = 14.121 TWh, about 34.3% more annual energy than the 10.512 TWh facility load.
The 27% capacity factor is a good solar region scenario, not a promise for every parcel of land. NREL's utility scale PV reference uses one axis tracking with a 1.34 DC to AC ratio and estimates U.S. AC capacity factors by solar resource class. Its class 6 estimate is 26.9%, close to the 27% rounded input here. Actual performance still depends on the site, equipment, downtime, interconnection and curtailment.
The chart compares three annual totals. Solar only overproduces energy across the year under the model's assumptions, but it still produces nothing at night. The mixed case is sized to match the annual load exactly before storage losses: half from PV and half from wind. Annual equality is an accounting result, not evidence that the facility stays online every minute.
A 50/50 wind and solar case
To include wind without pretending every site has the same resource, assume wind supplies half the 10.512 TWh annual load at a 40% net capacity factor. That requires 5,256 GWh ÷ (8,760 h × 0.40) = 1.50 GW of land based wind. DOE reported a 40% average 2022 capacity factor among U.S. wind projects built from 2013 through 2021. That is a national historical average, not a guarantee for a particular site.
Solar supplies the other 5.256 TWh at 27% AC capacity factor. With the 1.34 DC to AC ratio, that requires 5,256 GWh × 1.34 ÷ (8,760 h × 0.27) ≈ 2.978 GWdc of PV. A site that combines a strong solar resource with a strong wind resource is a real siting question. The two best resources are not necessarily co located, and transmission can eat into the apparent advantage.
For cost, DOE's 2024 PV system benchmark is $1.12/Wdc for a reference 100 MWdc system that includes 240 MWh of storage. Scaling that benchmark mechanically to 2.978 GWdc gives 2.978 billion Wdc × $1.12/Wdc = $3.335 billion. It includes about 2.978 GWdc × 2.4 h = 7.147 GWh of storage at the reference ratio. That scaling is a comparison point, not a project quote, and it does not buy enough storage for a 24/7 facility.
DOE's recent installed capital cost range for land based wind is about $1,200 to $1,800/kW. Applied to 1.50 GW, the wind part is 1,500,000 kW × $1,200 to $1,800/kW = $1.80 billion to $2.70 billion. The combined generation benchmark is therefore roughly $5.14 billion to $6.04 billion, before a sufficient firming system, operations and maintenance, financing, tax treatment, additional transmission or site work.
Whole-center payback: what does the compute have to earn?
A facility does not pay itself back because it has GPUs. Someone has to pay to use them, and the GPUs have to stay busy. There is no public revenue forecast for this hypothetical 1-GW center, so this is a transparent project scenario, not a claim that either company can sell every GPU-hour.
The model contains 69,931 DGX B200 systems, or 559,448 GPUs. Assume 70% paid utilization across 8,760 hours per year. That is 559,448 × 8,760 × 0.70 = 3.431 billion paid GPU-hours/year. For a price range, Runpod lists B200 Secure Cloud at $7.99 per hour; AWS lists an effective $14.208 per accelerator-hour for a P6-B200 Capacity Block in U.S. regions. These are public cloud prices for different service packages, not guaranteed net revenue to a data-center owner. I use them as bookends, not a forecast.
At those rates, the fleet would book about $27.41 billion to $48.74 billion/year in gross GPU sales if the 70% utilization assumption held. At a scale of more than half a million GPUs, that assumption is doing a lot of work. Contract discounts, idle capacity, networking limits, price changes, outages, and competition all reduce realized revenue.
Earth: modeled facility plus power system
The Earth capex case adds the same assumed $32.17 billion GPU fleet to $12.43 billion for 1-GW shell-and-core construction with JLL's 10% liquid-cooling premium, plus $5.14 billion to $6.04 billion for the wind and solar generation benchmark and $12.86 billion for storage to reach the 50-GWh scenario. The PV benchmark already contains 7.15 GWh, so that amount is not counted twice.
The modeled total is $62.59 billion to $63.49 billion. The JLL technology fit-out figure is left out because it may overlap with server hardware. The roughly $979 million Corpus Christi desalination proposal discussed below is a reference point, not a matching data-center bid, so it stays outside this total.
Space: priced subtotal, with large holes still in the invoice
The orbital subtotal includes the same $32.17 billion server-cost assumption, $17.45 billion to $22.50 billion in launch charges from the mass model, and $1.79 billion as a deliberately crude array-manufacturing proxy: 1.6 GW multiplied by the DOE terrestrial PV-plus-storage benchmark of $1.12/Wdc. That benchmark is not a price for space solar hardware, and its reference system includes only a small battery.
The resulting $51.41 billion to $56.46 billion is a priced subtotal, not a complete space data-center budget. It excludes the manufacture and deployment of radiators, eclipse storage beyond the tiny benchmark allowance, radiation shielding, orbital assembly, communications, propulsion, spares, replacement launches and maintenance.
On the stated assumptions, simple capex-to-gross-revenue payback is about 1.28 to 2.32 years for Earth and 1.05 to 2.06 years for the priced orbital subtotal. Earth already includes its modeled power plant and 50-GWh battery; the space subtotal still has unpriced hardware. The apparent orbital lead is only about $6 billion to $12 billion of missing-cost headroom against the Earth case. If the omitted space systems cost more than that, the capital-cost ranking flips. Their costs are not known well enough to call this an all-in space payback.
These are gross-revenue recovery periods, before payroll, networking, maintenance, cooling-system upkeep, server replacement, financing, taxes, insurance, downtime or other cash costs. Earth also needs an hourly reliability plan; its modeled 50-GWh battery is only 41.7 hours at full load before reserves and losses. The comparison therefore answers a narrow but useful question: under the same assumed GPU prices and utilization, how quickly could gross compute sales equal the modeled capital bill? It does not tell us whether the project would be profitable or financeable.
Storage has to solve hours, not annual totals
A 50 GWh battery at an assumed $300/kWh costs 50,000,000 kWh × $300/kWh = $15 billion. At a 1.2 GW continuous load, its nameplate duration is 50 GWh ÷ 1.2 GW = 41.7 hours. Fourteen hours without wind or solar uses 1.2 GW × 14 h = 16.8 GWh, before reserve margin and conversion losses. The 7.147 GWh storage scaled into the PV benchmark covers only about 6 hours at full facility load.
The NREL 2024 utility scale battery model covers 2 to 10 hour lithium ion systems. Its projection report gave 2024 complete four hour system costs from $327 to $503/kWh in 2022 dollars. Applying that number directly to a 41.7 hour design would be a scope error. Longer duration systems change the balance between battery energy, inverter power and balance of system costs. The only fair statement at this stage is that storage beyond the small PV benchmark allowance is a major additional capital item, and its cost needs a duration specific design.
Wind improves the generation profile because it can produce at different hours from solar, but “complementary” does not mean “firm.” A credible design needs an hourly weather year, multiple years of resource data, curtailment analysis, storage dispatch, grid backup or another firm source. The 50/50 annual model is a way to size the energy totals, not an operating simulation.
Water: power and a project cost reference
Water demand is a site design value, not a fixed GPU property. Evaporative cooling consumes water. Closed loop liquid cooling and dry heat rejection trade water use against electricity, equipment and local climate. A 20 million gallon per day water requirement is therefore an explicit utility scenario here, not a claim that this data center needs that much water.
Twenty million U.S. gallons per day is about 75,708 m³/day. The U.S. Department of Energy's seawater reverse osmosis bandwidth study uses about 4 kWh/m³ for its representative case. The implied desalination energy is 75,708 m³/day × 4 kWh/m³ ÷ 24 h/day = 12.62 MW, or about 0.111 TWh/year. That is about 1.05% of the 1.2 GW facility load. It excludes intake, pretreatment, brine handling, conveyance, and the plant's own maintenance.
For a capital cost reference, Corpus Christi received a preliminary guaranteed maximum price proposal of $978.77 million for its Inner Harbor seawater desalination plant in February 2026. The city's permit describes an initial production phase of 20 MGD, expandable to 30 MGD. This is a municipal project with a particular site, permitting, intake and delivery scope. It is not a plug in estimate for a data center, and I have not scaled it linearly to this scenario.
It does show why “the water is only 1% of the power” does not mean the water infrastructure is free.
What the comparison can and cannot say
Earth has power markets, transmission bottlenecks, permitting fights, water politics, and expensive data center construction. It also has crews who can replace a pump, fiber networks that reach customers, and a way to deliver equipment without launching it through the atmosphere. JLL's 2026 outlook puts average global shell and core construction at $11.3 million per MW; liquid cooled facilities have a reported 10% premium, and AI technology fit out can add as much as $25 million per MW. Those are site construction benchmarks, not full project cost.
On the equipment side, 69,931 DGX systems at an assumed $460,000 each would cost $32.17 billion. The price is a planning input, not a verified NVIDIA quote, and it may overlap with JLL's AI technology fit out category. Don't add those numbers and call the sum a complete budget. The same discipline applies to orbital compute: the $17.45 billion to $22.50 billion launch scenario is only launch charges at an assumed $50 million per flight, not the spacecraft, depot, deployment, assembly or replacement cost.
Earth's annual energy bill equivalent at the 2025 national industrial price is about $895 million, but that is not the cost of electricity in a particular contract and not revenue. The gross-revenue payback above compares modeled project capital with projected GPU sales. It is a screening calculation, not evidence that the data center would be profitable.
These numbers do not prove that terrestrial data centers always win. They show what the orbital pitch has to beat: a buildable renewable supply mix, repairable power and cooling equipment, transmission and an hourly reliability plan. Orbit replaces water and permitting arguments with massive radiators, deployment hardware, launch campaigns and a still-unsolved storage problem. The universe has fewer zoning boards. It has not agreed to waive the heat balance.
Sources and reading notes
- JLL 2026 Global Data Center Outlook, average $11.3 million per MW shell and core, liquid cooling premium, land and active IT exclusions, and AI technology fit out.
- U.S. Department of Energy 2024 PV system cost benchmark, 100 MWdc PV plus 240 MWh energy storage reference case.
- NREL 2024 utility scale PV Annual Technology Baseline, AC capacity factors by resource class and the 1.34 DC to AC reference ratio.
- U.S. Department of Energy Land Based Wind Market Report 2023, 40% average 2022 capacity factor among projects built from 2013 to 2021.
- U.S. Department of Energy WINDExchange economics, recent land based wind installed capital cost range.
- U.S. Energy Information Administration Electric Power Annual, Table 2.4, 2025 average industrial electricity price.
- NREL utility scale battery cost projections, complete four hour system cost range and limitations.
- U.S. Department of Energy seawater desalination bandwidth study, representative reverse osmosis energy requirement.
- City of Corpus Christi's February 2026 desalination cost proposal, preliminary price, not an awarded construction cost.
- City of Corpus Christi Inner Harbor desalination permit application, initial 20 MGD phase and expansion to 30 MGD.
- Runpod B200 pricing, Secure Cloud list price used as a revenue proxy.
- Amazon EC2 Capacity Blocks for ML pricing, effective P6-B200 per-accelerator reservation rate used as a second proxy.