m?MUSK BE KIDDING

Any Day Now

Showing 4 projects · 76 milestones

Select a diamond to read the milestone and its sources. Future markers are stated horizons, not confirmed dates. Reviewed 2026-10-15.

PROJECT / MISSION
2005201020152020202520302035204020452050
EXPECTED COMPLETION
Solid bars: program history · ◆ Milestone · ◇ Forecast · Red diamond: change / setbackDashed continuation is open-ended, not a committed schedule. Red line: review date.

Mars Base

Develop the transportation and infrastructure for a self-sustaining human settlement on Mars.

Start · 2002

SpaceX founding is the program baseline, not the start of construction on Mars.

Expected completion · No firm completion date

A 2026 statement described a 20-plus-year Mars-city horizon. The marker at 2046+ is arithmetic from that statement, not a scheduled opening.

SpaceX foundedRecorded

Company formation is the starting point for this long-term program.

First orbital launchRecorded

Falcon 1 reaches orbit. This establishes launch capability; it is an early enabling milestone, not progress on construction of a Mars base.

First droneship landingRecorded

Falcon 9 lands its first stage on a droneship. Recovering boosters advances the reusable-launch approach behind the longer-term Mars transport ambition.

Mars transport roadmapRecorded

The Starship predecessor architecture brought the settlement ambition into a public transportation-system roadmap.

People fly aboard DragonRecorded

SpaceX begins crewed Dragon flights. Human orbital transport is a precursor capability, distinct from a crewed Starship or a Mars mission.

NASA selects Starship landerRecorded

NASA selects SpaceX to develop its Artemis human landing system. The lunar program creates a funded development path for related Starship capabilities; it is not a Mars landing contract.

SN15 lands after high flightRecorded

SN15 completes its high-altitude flight and landing. The prototype demonstrates the descent maneuver before integrated Super Heavy flights.

First integrated launchRecorded

The first combined Starship and Super Heavy test lifts off but ends with loss of the vehicle. Integrated testing begins; a successful mission is still ahead.

63 corrective actionsSetback

The FAA closes the first-flight mishap investigation with 63 corrective actions. Closing the investigation alone does not authorize the next launch.

Propellant moves between tanksRecorded

Flight 3 performs an internal cryogenic propellant-transfer test. This is a step toward refueling, not a demonstration of transfer between separate spacecraft.

Return and splashdown testRecorded

The fourth integrated test demonstrates return and splashdown capabilities for the ship and booster, moving beyond the earlier loss-of-vehicle outcomes.

Tower catches Super HeavyRecorded

The launch tower catches the returning booster for the first time. This advances recovery of the first stage, not full reuse of both stages.

Raptor relights in spaceRecorded

Flight 6 relights one Raptor in space, demonstrating a capability needed for controlled deorbit burns and later orbital operations.

2026 flight forecastForecast

Musk targeted an uncrewed Mars mission for the end of 2026. This was not a base-completion target.

Flight 10 meets major objectivesRecorded

SpaceX reports all major flight objectives met. This is a vehicle-development milestone, not an operational Mars transport service.

Moon-first revisionRevision

Musk prioritized a lunar city and described starting the Mars-city effort in five to seven years.

Next-generation flight testsRecorded

Flight 13 performs ascent, hot staging and an in-space Raptor relight. Testing continues to build the transport capabilities needed before settlement missions.

2031–33 start horizonTarget

Derived from the five-to-seven-year statement in February 2026. A start window, not a completion date.

2046+ city horizonAmbition

Derived from the February 2026 estimate of more than twenty years for a Mars city. No firm delivery date.

Reinvent tunneling

Reduce tunnel cost and construction time so underground transport can ease surface traffic and connect cities more efficiently.

Start · 2016-12

Public tunneling pledge in December 2016.

Expected completion · Open-ended mission

Prufrock targets one mile per week and under $5 million per mile for Loop tunnels. The company does not give a deadline for achieving the overall mission.

Start diggingRecorded

Musk publicly pledged to build a boring machine and begin tunneling.

Test tunnel unveiledRecorded

A completed demonstration tunnel established a physical prototype, not a citywide transport network.

LVCC Loop opensRecorded

The company reports the convention-center system opened for an April 2021 event.

Hyperloop vacuum test tunnelRecorded

The company reports constructing a short Bastrop tunnel to test vacuum-pump systems. This is a test facility, not a passenger Hyperloop service.

Mining without tunnel crewRecorded

TBC reports demonstrating continuous mining and ring assembly with nobody inside the tunnel. A company-reported automation milestone, not independent proof of sustained production speed.

Nashville project announcedRecorded

Tennessee and TBC announce Music City Loop, extending the proposed network beyond Nevada. Announcement precedes permitting and construction.

Dubai study agreementRecorded

Dubai’s RTA and The Boring Company agree to study a tunnel system. This precedes the later construction agreement and does not itself mean digging has begun.

Encore connector opensRecorded

The company reports its Encore–LVCC connector opened in 2025. This adds another working connection beyond the original convention-center loop.

Hard-rock machine on siteRecorded

The February report says Prufrock-MB1 is installed and ready while permitting is being finalized. Site readiness is separate from authorization to mine.

Nashville permit + tunnelingRecorded

TBC reports receiving its TDOT tunnel permit and starting tunneling the same day. This is the first hard-rock construction step, not passenger operations.

Dubai pilot agreementRecorded

A definitive agreement sets out a 6.4-km, four-station pilot. The company describes design, permitting and mobilization steps before tunneling.

Two machines mine togetherRecorded

TBC reports two Prufrock machines mining simultaneously in Nashville. Parallel operation is an important scaling test for the hard-rock program.

Autonomous ring assemblyRecorded

TBC reports automated placement of a six-segment tunnel ring in under a minute. This is a ring-building claim, not an overall tunnel advance rate.

$3B expansion financingRecorded

The company announces financing for hiring, Loop expansion and Prufrock development. Funding increases capacity to pursue the mission; it does not demonstrate delivery.

Speed and cost targetsTarget

As reviewed in October 2026: one mile per week and under $5 million per mile. These are company targets, not independently measured results or newly announced deadlines.

Third Nashville machine targetedTarget

The October 1 update targets a late-October MB3 launch. This marker is the target month, not a completed launch; it was still ahead at the October 15 review.

Four machines by year endTarget

TBC aims to have four machines underground in Nashville before year end. This is a construction-capacity target, not the opening date of passenger service.

Tesla’s changing mission

Current wording: build a world of amazing abundance. The mission has broadened from electric transport to energy, autonomy and robotics.

Start · 2003

Company founding; the public master-plan record begins in 2006.

Expected completion · No defined finish line

Tesla’s mission statements describe a direction, not a dated project handover or a measurable company-wide completion percentage.

  1. Transport2003 → 2016
  2. Energy2016 → 2025-09
  3. Sustainable abundance2025-09 → 2025-12
  4. Amazing abundance2025-12 → current wording
Company foundedRecorded

Founding is the timeline baseline. Musk joined as an investor in 2004; company founding is not attributed to him here.

First master planRecorded

The staged vehicle strategy begins with a sports car and moves toward more affordable electric vehicles.

Roadster enters productionRecorded

Tesla begins regular Roadster production, giving the first master plan its initial commercial vehicle. A high-price sports car is the first stage of the proposed affordability ladder.

Model S deliveries beginRecorded

Model S customer deliveries begin. The sedan broadens Tesla’s product range beyond the Roadster and advances the staged vehicle plan.

Supercharger network unveiledRecorded

Tesla introduces its fast-charging network. Charging infrastructure tackles a practical barrier to longer-distance electric driving.

First Powerwall installedRecorded

Tesla dates the first Powerwall installation to May 2015. Home storage becomes a concrete product alongside the electric-vehicle business.

Part Deux expands the planMission scope

The second plan adds integrated solar and storage, more vehicle segments, autonomy and an owner-operated shared fleet. These are stated goals, not proof of their delivery.

SolarCity acquisition closesRecorded

Tesla completes the SolarCity acquisition, bringing solar generation into the company alongside vehicles and batteries. This gives the broader energy mission an operating solar business.

Mission: energyMission change

The mission broadens from sustainable transport to sustainable energy, encompassing generation and storage. The wording is documented in subsequent Tesla filings.

Model 3 deliveries beginRecorded

Deliveries begin for the lower-priced sedan designed for the mass market. Initial delivery is distinct from reaching sustained high-volume output.

Powerwall mass productionRecorded

Tesla’s product history dates Powerwall mass production at Giga Nevada to 2017, expanding the manufacturing base for home energy storage.

Megapack joins energy lineupRecorded

Tesla introduces the larger Megapack storage product for utility-scale applications. The energy mission now includes a dedicated large-project battery platform.

Early Semi deliveriesRecorded

Tesla begins early production and deliveries of its commercial electric truck, extending the vehicle mission into heavy freight.

Optimus prototype previewRecorded

Tesla previews a humanoid robot. Robotics becomes a visible development program, but a prototype demonstration does not establish a commercially deployable workforce.

Global energy planRecorded

Master Plan Part 3 lays out a pathway to a sustainable global energy economy. Publication is not completion of that transition.

Limited Austin Robotaxi launchRecorded

A small fleet begins taking paying passengers in Austin. This limited rollout is distinct from the broad shared-fleet vision in Part Deux.

Sustainable abundanceMission change

Master Plan IV puts AI, robotics, mobility and energy together under sustainable abundance.

Amazing abundanceMission change

Musk announced a wording change in December. Tesla’s current master-plans page uses amazing abundance.

One million PowerwallsRecorded

Tesla reports installation of its millionth Powerwall. This is a deployment-scale milestone, not a claim that the wider energy transition is complete.

Robotaxi expansion falls shortRevision

Reuters reports expansion remained limited after earlier geographic targets, with executives taking a more cautious tone. Deployment scope still matters when judging the autonomy mission.

The long read · Wait But Why

By Tim Urban. These historical explainers help describe the ambitions; they are not current status reports or independent verification that a target was met.

Company founding dates provide context, not construction start dates. Year-only milestones retain year precision. This editorial tracker is updated separately from the hourly news feed.